As a result of the solar power station installed on the rooftop of Reebok Sports Club:<br>Annual savings: 13,824,000 AMD CO₂ emissions avoided: 153 tons Annual solar energy production: 307,200 kWh The system is equipped with high-quality JA Solar branded panels.

January 19, 2026
Project Location
Republic of Armenia, Yerevan City, Davtashen
Standing power
177 kW
Annual productivity
307,200 kWh
Annual savings
13․824․000 AMD

About the Project

Solar Power Station at Reebok Sports Club | 177 kWp