Back

Solar Station for Radisson Blu Hotel

EcoVille installed an 89.1 kWp solar system for Radisson Blu Hotel Tbilisi, delivering an annual clean energy production of approximately 113,100 kWh and savings of around 32,800 GEL.

January 16, 2026
Project Location
Tbilisi
Standing power
89․1 kWt
Annual productivity
113,100 kWh
Annual savings
GEL 32,800

About the Project

Our team managed the entire process, from system design and engineering to installation, commissioning and monitoring setup, ensuring high efficiency, reliability, and seamless integration with the hotel’s infrastructure.

For hotels, adopting solar energy is a strategic investment in sustainable business development. It significantly reduces energy costs and carbon footprint, while strengthening the brand’s commitment to responsible and eco-friendly hospitality.